Commercial · end of lease defit

Make-good is defined by your lease. That is the document we scope from.

End-of-lease defit, strip-out and make-good for commercial tenancies across South Australia, Victoria and New South Wales. Scoped from the lease, priced line by line.

3
Documents that decide the scope: lease, condition record, fitout history
$20m
Project capacity under a single contract
3
States we build in: South Australia, Victoria and New South Wales
100%
Of the scope traceable to a clause or a photograph

The premise

Most tenants pay for a make-good larger than the one they owe.

Not because anyone is acting badly. Because the lease was filed in 2019, nobody photographed the tenancy on day one, and the scope arrives with six weeks to go.

By the time a make-good scope lands, the tenant is usually mid-relocation, short of time and without the documents that would let them discuss it properly. The scope gets accepted, and it can include removing a ceiling grid, a partition line or a floor covering that was in the tenancy before the tenant ever arrived.

The work itself is not complicated. Strip-out is one of the more straightforward things a builder does. The value is entirely in the scope, and the scope is entirely in the documents.

1  The clause What does the lease actually require? Not what is customary. 2  The condition What did the tenancy look like on day one? Schedule, photos. 3  The provenance Which parts are your fitout, and which did you inherit? A defined scope Priced, and defensible line by line. then choose Do the works on your programme Settle in cash against a real number Skip steps 1 to 3 and this happens instead A scope arrives. With no lease analysis, no condition record and no provenance, there is nothing to discuss it against, so it is settled on the only information available, which may include items that pre-date your tenancy.
The order matters. Each of the first three steps narrows the scope, and skipping any of them hands the definition to the other side.

The scope review

What we do before we price anything.

READ

The make-good clause, the permitted use, the fitout approval and any side letters. Leases differ far more than people assume, some require base building condition, some require the condition at commencement, some require only that approved alterations be reinstated.

ESTABLISH

The condition at commencement, from the schedule of condition if one exists, from the original fitout drawings, or from whatever photographic record can be assembled.

SEPARATE

Your fitout from what you inherited, element by element. This is the line item that most often moves the number.

PRICE

Line by line against that scope, so that each item can be discussed on its own rather than as a lump sum nobody can interrogate.

The negotiation

Doing the works and paying a settlement are both legitimate. They are not the same number.

Doing the works

You control the programme, the standard and the contractor. Suits a tenancy where the scope is clear, access is available and the landlord has no incoming tenant waiting.

Cash settlement

Frequently faster and sometimes cheaper, particularly where the landlord already intends to strip the floor for an incoming tenant, in which case some of the make-good you would perform is work they were going to undo anyway. That argument only works if you can price the scope properly first.

The incoming tenant question

Always worth asking. If the floor is being reconfigured, a full reinstatement may be genuinely wasteful, and landlords are often open to a commercial answer when it is put to them with a costed scope rather than as a request.

Timing

A make-good discussion opened twelve months before expiry is a negotiation. Opened six weeks before, it is an acceptance. The single highest-value thing a tenant can do is start early.

What we do not do

We do not give legal advice on your lease. We scope, price and build, and we tell you what we can see in the document. Where the interpretation matters, your lawyer should read it.

The work is simple. The scope is the whole project.

Tenancy strip-out · library image

The works

What a defit actually involves.

  • Strip-outPartitions, ceilings, floor coverings, joinery and fitout services back to the required condition, which is the condition the lease names, not the emptiest possible room.
  • Services reinstatementAir conditioning returned to base building configuration, electrical and data removed back to the point of connection, fire services returned to the certified base building layout. This is where make-good becomes technical rather than physical.
  • CertificationModified fire and essential safety systems need to be re-certified. A make-good that leaves a system uncertified is not complete, however empty the floor looks.
  • Patching and finishesWall and ceiling patching, painting where required, and floor preparation. Usually the largest visible portion and the easiest to over-scope.
  • Waste and recoverySeparated for recycling, with tracking. Where a client has a corporate reporting obligation this becomes a deliverable rather than a courtesy.
  • Evidence of completionPhotographs, certificates and a sign-off pack, because the landlord’s acceptance is the end of the obligation and it should be documented.

The questions we are asked most

Make-good, in practice.

Who decides what make-good means?

The lease does. Not convention, not the last building you were in, and not what a contractor tells you is normal. If the clause is ambiguous, that ambiguity is usually worth money to you rather than against you.

Do we have to put back walls we never took down?

Not if they pre-date your tenancy and you can show it. That is exactly what the condition record and the provenance step are for.

The landlord wants a cash settlement. Is that good or bad?

It can be either, and you cannot tell which without a priced scope. Settle against a number you have built up yourself, never against one handed to you.

What if the incoming tenant is going to strip it anyway?

Then some of the reinstatement is work that will be undone, and that is a reasonable thing to raise. It only works as an argument if you can price what you are giving up.

Do we need to remove the ceiling grid?

Depends on whether you installed it. This single item moves the number on more make-good scopes than any other.

When should we start?

Twelve months out. Opened early it is a negotiation; opened at six weeks it is an acceptance.

Questions

When should we start thinking about make-good?

Twelve months before expiry, and ideally when you sign. The clause is negotiable at signing and effectively fixed afterwards.

The landlord has sent us a scope. Can you just price it?

We can, and we will also tell you which items we think sit outside the lease obligation. You can then decide what to challenge. Pricing it without reading the lease would be doing half the job.

We have no schedule of condition. Is that fatal?

No, but it makes the provenance step harder. Original fitout drawings, approval correspondence, old photographs and even marketing images of the floor can all help establish what was there.

Can you do the works after hours or in stages?

Yes. Buildings frequently require it, and a staged strip-out can allow partial handback earlier, which sometimes stops rent.

Do you also do industrial make-good?

Yes, and it is a different problem. Floor coatings, racking, bunding and plinths rather than ceilings and partitions. There is a separate page for it.

Send us the lease and a floor plan.

We will read the make-good clause and tell you what we think you actually owe, before anyone prices a strip-out.