Client-side project management · SA · VIC · NSW

We act for you, or we build for you. Never both on the same project.

Client-side project management, superintendent and contract administration services for owners, tenants and institutions. Delivered by people who have carried construction risk on their own balance sheet.

Never
Do we administer a contract we hold. The rule is in the appointment, not in a brochure
3
States: Adelaide, Melbourne and Sydney, with people on the ground in each
15+
Years of the director’s experience on the contractor’s side of the table
Published
Fee basis, set out in full before you appoint us

Advice that carries cost knowledge

We price the work and we build the work, so we are telling you what we know.

When we advise you on what a tender really contains, what a programme can actually carry or what a variation should cost, we are drawing on numbers we have had to stand behind on our own contracts.

A team that has priced the work, carried the risk and defended a claim knows where the money and the time go. It knows which provisional sum is hiding real scope, which rate is carrying somebody else’s risk, and where a bar chart has quietly moved the critical path. That knowledge is current rather than benchmarked, because it comes from tendering and delivering the same kind of work in the same market in the same month.

It only works if you can rely on whose side we are on, so we have written that down and put it in the appointment rather than leaving it as an assurance.

The rule

We will not act as your project manager, superintendent, contract administrator or certifier on a project that JCGAU is building, tendering for, or has any commercial interest in. If we are acting for you and an opportunity to build arises, we tell you and we withdraw from one role or the other, and you choose which. That is written into our appointment rather than left to good intentions.

MODE A. WE BUILD FOR YOU Owner Superintendent another firm, not us THE CONTRACT LINE JCGAU, head contractor carries the build risk and the margin Subcontractors and suppliers head contract certifies, values, directs Our interest sits below the line. Someone independent has to hold the certifying pen. MODE B. WE ACT FOR YOU Owner JCGAU as your representative fee only, no build margin THE CONTRACT LINE Head contractor a builder we tender, recommend and administer Subcontractors and suppliers head contract administers on your behalf Our interest sits above the line, with yours. We are paid a fee, and we hold the builder to their contract.
The contract line is the point at which interests diverge. In Mode A our margin sits on the other side of the table from yours, which is exactly why someone else should hold the certifying pen. In Mode B we sit on your side of the line and are paid a fee for judgement, not a margin on the work. Both are legitimate. Taking both at once is not.

What it actually buys you

The value shows up on the day a claim lands.

Project management sounds abstract until a variation arrives with a number on it. That is the moment you find out whether anyone is reading the contract on your side.

ONE CLAIM, TWO OUTCOMES The contractor submits a variation a cost, a time effect, and a reason WITHOUT A REPRESENTATIVE The assessment sits with the party that raised it Entitlement, scope and programme effect assessed in one place You see it in the progress claim After the work is done and the leverage has gone Where the gap shows up The conversation is now about a completed item rather than a decision about work not yet started. SOMEONE ACTING FOR YOU Tested before it is valued Contract for entitlement, drawings for scope, programme for float A recommendation, with a number and a reason Approved, reduced, or rejected, and why You decide before the work proceeds Direct it, change it, or decline it. The decision is yours while it still costs nothing to make. The claim is identical in both columns. What differs is whether the contract was read on your behalf before the money moved, and whether the decision reached you while there was still a choice to make. That is the gap we fill.
A variation is cheapest to resolve before the work starts and most expensive once it is built. Everything a client-side appointment does is an attempt to move that decision to the left.

What we bring

A builder’s literacy, pointed the other way.

Most of what goes wrong on a construction contract goes wrong in a document that a client reads once and a contractor reads five times.

ESTIMATING

We price the way a contractor prices, so we know what a tender has left out, where the provisional sums are hiding real scope, and which rate is carrying somebody’s risk.

BUILDABILITY

Design reviewed for how it gets built before it goes to tender. Access, sequence, tolerance, and the details that quietly become variations once someone has to construct them.

PROGRAMME

A contractor’s programme is an argument, not a report. We interrogate the logic, the float and the resourcing, and we say so when the critical path is not where the bar chart claims it is.

CLAIMS

Extensions of time, variations, delay and disruption. We have written these claims, and having written them is a different vantage point from having only read them.

How you appoint us

Five engagement types, each with what it does and does not carry.

The first decision is not what needs doing, it is how you want to engage. These are the five appointments we take, in the language the contract will use.

Appoint us asWhen it suitsWhat we are accountable forWhat we are not
Client-side project managerYou want one party carrying the project from feasibility through to the end of the defects liability period.The programme, the budget, the consultant team, the procurement strategy and the reporting you receive.Constructing the works. That sits with the head contractor under their own contract.
SuperintendentA contract is in place under AS 4000, AS 4902 or AS 2124 and it needs administering and certifying.Assessing claims, valuing variations, determining extensions of time, and issuing certificates on the contract rather than on the meeting.Advocacy. The superintendent’s certifying function is exercised honestly and reasonably between the parties, and we will say so to both.
Superintendent’s representativeYour superintendent needs day-to-day presence on site under a delegated appointment.Site attendance, instructions, inspections and the written record, within the delegation given.Anything reserved to the superintendent under the delegation, which stays with them.
Project and budget reviewA project is already under way and you want an independent read on where it actually stands.A fixed scope and fixed fee assessment of programme, cost to complete, variations, claims exposure and the contract position, delivered as a written report.Ongoing management, unless you separately appoint us to it afterwards.
Early contractor involvementThere is a concept, a site or a tenancy and no documented set yet, and you want the cost and buildability read before committing to full documentation.Constructability review, an indicative cost range with the assumptions listed, and the procurement route we would recommend.A fixed price. An early range is a range, and we will always be explicit about which you are receiving.

Every one of these is scoped in writing before it starts, including the fee basis. The engagement type is named in the appointment, so there is never a question later about which role we were holding.

Where we come in

An appointment can start at any of five points.

WE CAN COME IN AT ANY OF THESE FIVE POINTS 01 Feasibility and budget What the site or tenancy carries, and what it costs. 02 Consultants and documentation Scopes, appointments and a cost plan tested at every design stage. 03 Procurement and tender The market tested and a written, defensible recommendation. 04 Delivery and superintendency Claims assessed, variations priced, the programme interrogated. 05 Completion and defects liability Final account settled and the asset handed over with its record. HOW MUCH OF THE BUDGET IS STILL IN PLAY Most of it A great deal Some Contingency The final account Most appointments we are asked about start at stage three or four, because that is when the risk becomes visible. The appointments that return the most start at stage one, because that is where the decisions that set the cost are still open. We take both, and we will tell you honestly what is still available to influence. Already under way? A fixed scope, fixed fee project and budget review is the usual starting point.
You do not have to appoint a project manager at the beginning for it to be worth doing. You do need to know how much of the budget is still open when you appoint one, and that is the first thing we will tell you.

The credentials behind it

What sits under the appointment.

JCGAU builder licence
BLD 344769
Director experience
15+ years
States
SA · VIC · NSW
Capacity
$20m single contract
Management plans
Written and in use, not certified

Independence by rule

A written bright line, not an assurance. We withdraw from one role or the other, and you choose which.

A record that survives

Instructions, assessments and certificates kept so a decision can be reconstructed two years later.

Claims literacy

Extensions of time, variations and prolongation read by someone who has written them.

One director, named

The person who prices your project is the person who runs it.

The roles

The appointment you need has a name: they are not interchangeable.

These four functions are often grouped under the single phrase “project management”, and they are not the same appointment. They carry different duties, they are priced differently, and one of them carries a duty that is not owed to you. Our appointment names which of them we hold, so there is no question later about what you engaged us for.

AppointmentWhat it actually doesDuty is owed toWhere the conflict bites
Client’s representativeSpeaks for the owner. Coordinates consultants, holds the programme and budget, runs reporting and decisions.The owner, as agentIf the representative’s firm is also tendering the build, the recommendation and the interest sit in the same place. The structure creates that, not anyone’s intent.
Project managerScope, programme, cost plan, risk register, procurement strategy, stakeholder and authority management.The ownerSame. The recommendation on which builder to appoint is the whole value of the role.
Superintendent under AS 4000 or AS 2124Two jobs in one appointment. Directs the contractor as the principal’s agent; but when certifying payment, valuing variations, assessing extensions of time and issuing practical completion, must act honestly and impartially between the parties.Split. The owner for directions, both parties for certificationThe acute one. Certifying under a contract held by a related party is a structural problem rather than a question of anyone’s good faith, which is exactly why it is better avoided than managed.
Superintendent’s representativeDelegated day-to-day functions on site, within limits the superintendent sets in writing.As delegatedInherits the same problem, one step removed.
Contract administratorProcesses claims, variations, notices and correspondence. Keeps the record that a dispute is later decided on.The ownerAssessing claims made by a related party puts the same party on both sides of the assessment.
Independent certifierCertifies to a financier, a purchaser or a third party who is not a party to the building contract.The addressee of the certificateRequires independence from both the owner and the builder. We would decline this role where we have any interest in either.

Contract terminology follows the standard forms in general use in Australia. The exact wording of any appointment should be settled by your own legal adviser. This page describes practice, not advice.

Certification only means something when the person signing has no interest in the answer.

On site · JCGAU

What you get

Deliverables, by stage: named, so you can hold us to them.

StageWhat we produceWhat it is for
EstablishmentProject execution plan, governance and decision map, risk register, procurement strategy, preliminary programme, initial cost planSo that everyone knows who decides what, and when a decision becomes expensive.
DesignConsultant scopes and appointments, design programme, buildability review, cost plan reconciled at each design stage, authority and approvals trackerSo the budget is tested against the drawings at each stage rather than once at tender.
ProcurementTender strategy, tender documents assembled, tender period management, tender assessment and a written recommendation with a like-for-like comparison and the qualifications each tenderer attachedSo the recommendation is defensible to a board, and so the cheapest number is not mistaken for the lowest cost.
ConstructionMonthly report. Progress against programme, cost against budget with committed and forecast, variations register with status, EOT register, risk and safety summary, photographs. Claim assessment and certification where we hold that role.So there are no surprises, and so a claim is assessed on the contract rather than on the meeting.
Completion and defectsPractical completion inspection and defects schedule, handover data set, warranties, as-builts, O&M manuals, certificates, final account settlement, defects liability management to expirySo the building is handed over as an asset with a record, not a set of keys.

For landlords and asset owners

The lease sets the date. Everything expensive happens before it.

Most of what is written about project management speaks to tenants and investors. The owner with a floor coming back next year is the reader we had in mind here, because that is the gap we most often get called into.

A landlord buys something quite different from a tenant. A tenant is building a workplace once. A landlord is running a rolling programme of lease events, each of which carries a make-good position, a re-letting decision, an incentive negotiation and a capex question, and each of which lands whether or not anyone has prepared for it.

The work that protects the asset happens in the eighteen months before a lease expires, not in the fortnight after the tenant hands the keys back.

ONE LEASE EVENT, THREE WINDOWS 24 to 12 months out 12 to 6 months 6 months to handover New lease commences Where the value is Condition survey against the lease. What the make-good obligation is actually worth, priced, before it becomes a negotiation. Where the decisions are Make-good settled or enforced. Incentive works scoped and capped. Base building upgrades bundled while the floor is empty. Where the money goes Procurement, construction and handover against a date the lease has already fixed. Very little is still negotiable here. An empty floor is the cheapest time to do base building work and the only time a make-good position is worth anything. Most landlords engage someone in the third window, which is the one where every number is already set. We would rather you called us in the first.
The make-good obligation is worth what it is worth while the tenant is still in occupation and still wants their bank guarantee released. After that it is worth whatever you can negotiate.

What we do for a landlord

Six pieces of work, named.

Make-good assessment

A condition survey read against the actual lease and the fitout approvals, priced as a scope of works rather than estimated as a number. That is the difference between a position you can hold and an opening bid.

Make-good settlement or enforcement

Most make-good obligations are settled in cash rather than performed. Whether that is the right outcome depends on what you intend to do with the floor, and the answer changes the number. We will tell you which one favours you before you commit to either.

Tenancy coordination

Fitout guidelines, design review against base building capacity, contractor induction and access rules, and inspection at completion. Somebody has to hold an incoming tenant’s contractor to the rules of your building, and it should not be the centre manager doing it in the margins of their week.

Incentive and contribution works

Where a lease deal includes a landlord contribution or works, the scope needs a cap, a specification and a completion test. An uncapped contribution to a tenant’s fitout is a blank cheque with your name on it.

Base building upgrade

Lifts, amenities, lobby, end-of-trip, mechanical plant, and the energy performance work that increasingly decides whether a floor leases at all. An empty floor is the cheapest floor to do any of it on.

Capex sequencing

Across a portfolio, the question is not what each building needs. It is what order to do it in, against lease expiries, so the disruption lands when the floor is empty and the spend lands when it is deductible against a leasing outcome.

Fees

We publish the basis, so you can compare like with like.

A fee is much easier to judge when you can see how it is built and what would change it. So here is ours, before you ask.

Fixed fee by stage

Our default. A lump sum against a defined scope and a defined programme duration, split across the stages above. You know the number before you commit.

Percentage of construction cost

Available where a client prefers it, and we will say plainly what we think of it: it pays us more when your project costs more. If you choose it, we would rather cap it.

Time-based with a ceiling

For early advisory, feasibility and scoping work where the scope genuinely is not knowable yet. Rates and the ceiling are agreed in writing first.

What extends the fee

A programme extension beyond the agreed duration that is not our doing, a material scope increase, or an additional stage. Each of those is a written variation to our appointment, priced before it is incurred. The same discipline we would apply to a builder.

What does not

Ordinary project difficulty. Chasing a late consultant, arguing a variation down, or sitting in a hard meeting is the job.

Where we act

Adelaide, Melbourne and Sydney, with people in each.

A client-side appointment is worth very little from another city. Somebody has to be able to walk the job on a Tuesday morning without booking a flight.

Client-side project management in Adelaide

Head office. Development approval and building rules consent through the South Australian planning system, and a contractor market we price in every week.

Client-side project management in Melbourne

Building surveyor appointment, occupancy permits and the Victorian variations to the National Construction Code. An active team running Victorian projects.

Client-side project management in Sydney

Principal certifier appointment, the New South Wales registration and declaration regime, and the certification path that goes with it. An active team in New South Wales.

Our independence rules

Published, so the boundary is checkable rather than asserted.

These are conditions of appointment. They are written into the engagement, which is the only place a rule of this kind is worth anything.

  • We do not act client-side on a project we are buildingIf JCGAU holds or is tendering the head contract, we do not hold any client-side appointment on the same project. No exceptions and no carve-outs.
  • The rule follows the interest, not the entity nameA related party is treated exactly as JCGAU would be. There are no carve-outs and no nominee arrangements.
  • The appointment carries real authorityA project manager needs the authority to instruct consultants and to decline a variation, or the appointment cannot deliver what you are paying for. We scope that authority into the engagement at the start.
  • Certification is only signed where we are independent of both sidesCertifying to a financier requires independence from the principal and the contractor. Where we hold it, we certify. Where we do not, we say so at the outset and help you appoint someone who does.
  • We resource what we takeEvery appointment is staffed against a named team before it is accepted, so the commitment you are given is one we have already checked we can keep.

Questions

The ones we are actually asked.

Can you manage a project that another builder is constructing?

Yes. That is the normal shape of the client-side appointment. We tender it, we recommend a builder, and then we administer their contract on your behalf.

Can you act as superintendent under AS 4000?

Yes, on a contract we do not hold. The role requires certifying, valuing and assessing honestly and impartially between the parties, which is not something a related party can credibly do.

We already have an architect running the project. What would you add?

Architects lead projects well and often. What we would look at with you is simply whether every contract administration function has a clear owner, and if it already does, we will say so and leave it alone.

Do you replace our consultants?

No. We appoint, coordinate and hold them to their scopes. A project manager who duplicates the consultant team is a cost, not a control.

At what project size does this make sense?

When the number of parties exceeds what one person on your side can hold. That is usually earlier than people expect. It is about the number of interfaces, not the contract value.

What if we want you to build it after all?

Then we stand down from the client-side role and you appoint someone else to it, or we stay on your side and someone else builds. We will tell you which we think is better for you, and you decide. What we will not do is quietly hold both.

What is the difference between a client-side project manager and the builder’s project manager?

The builder’s project manager is paid by the builder and is accountable for the builder’s result: their scope, their programme, their margin. They are usually very good at it. They are simply not on your side of the contract, and on the day your interests and theirs diverge, the question is who is reading the contract for you.

Do I need a superintendent as well as a project manager?

Often the same person does both, and on a small project that is sensible. They are different functions though. The project manager runs the project for you. The superintendent performs the certifying functions the contract names, and has to do that honestly and impartially between the parties even though you are paying them. If a proposal does not tell you which of the two it is offering, ask.

How is client-side project management priced in Australia?

Three ways, and we set out ours on this page: a fixed fee against a defined scope and duration, a percentage of construction cost, or time-based with a ceiling. The structures are standard across the market. What is not standard is publishing which one you use and what moves it, which is why we do.

Is our project too small for this?

Probably not. Most of this category is written for institutional capex programmes, so a single tenancy, a warehouse, a clinic or a school hall reads as though it does not qualify. It does. The test is the number of parties you are holding, not the contract value.

We are a landlord, not a tenant. Is this for us?

Yes, and it is the part of the market that is least well served. Make-good assessment, tenancy coordination, incentive works, base building upgrades and capex sequencing around lease expiries are a different job from delivering one fitout, and there is a section on this page about exactly that.

Tell us which side of the line you need us on.

If you are appointing a builder, we can tender for it. If you are appointing someone to hold that builder to their contract, we can do that instead. Either conversation starts the same way.

Talk to a construction director